mainbar-sep

Construction

Our past work

Construction of a detached house
Duration of the turnkey project : 1 year
Reinforced concrete brick construction. Semi-buried garage. Two-level underfloor heating with air/water heat pump. Reversible air conditioning. Two VMC double flow systems for part habitable, and basement and garage.